quad 204 fpso

Quad 204, Schiehallion Field: Exploitation of a deeper reservoir fairway. Bayan Gas Redevelopment Project Phase 2, Offshore Sarawak, Kristin Sor Oil and Gas Satellite Fields, North Sea, Everything you need to know about Romania’s oil and gas industry, The Norwegian oil and gas projects pulling in investment, GMB union ramps up the British Gas engineer strike, Embattled and embrittled: how the offshore industry is tackling hydrogen embrittlement. (Loading), USD In order to process all this increased output, a new FPSO is being built. Fabrication of 44 process fluid handling structures, including manifolds, flowline and riser terminations, subsea isolation valve structures, and 30 control distribution structures including assemblies and umbilical terminations are being handled by Babcock. BP's Quad 204 Project involves the redevelopment of the Schiehallion (one of the biggest UK North Sea Fields) and Loyal fields, located west of the Shetland Islands in Blocks 204 and 205 of the UK Continental Shelf (UKCS) at water depths between 300m and 550m. BP a annoncé le 22 mai la mise en production de Quad 204, à l’ouest des îles Shetland. The oil and gas metering systems and slops separation facilities were supplied by Alderly Systems. Schiehallion Area has five dril… Located West of Shetland in the UK, the Quad 204 is an ambitious project to construct a new Floating, Production, Storage and Offloading (FPSO) unit to replace the existing Schiehallion FPSO. This project is expected to increase the Clair field’s life until 2050 and deliver up to 120,000 b/d at peak. Expro received a seven-year contract from BP to provide vertical Xmas tree landing string for the installation of BP’s subsea completions. The project has also seen a complete upgrade of the subsea infrastructure and the start of a major drilling campaign with up to 20 new wells planned. Technological advances also increased understanding of the fields and BP saw the greater potential the Schiehallion Area holds. It will also feature a sizeable extension of the existing subsea system, with 15 new and replacement flow lines, and 21 new and replacement risers. Moored by 20 mooring lines, each almost a mile (1.6km) in length. Schiehallion and Loyal fields started production in 1998 and have produced more than 400 million barrels of oil from 54 wells, with approximately 450 million barrels of resource still estimated to be in place. NFM builds full redundancy into Quad 204 turret winch. An ST8 series sewage treatment plant and the inert gas generator package for the FPSO were supplied by Hamworthy, while five more separate water treatment facilities were supplied by Eng-Cad. The Quad 204 project has involved construction of a purpose-built FPSO, the Glen Lyon, which is expected to process 130,000 barrels of oil a day at peak production. Connected to subsea by 21 new subsea risers, including 15 new production risers, 3 gas risers and 3 water injection risers. The state-of-the-art FPSO will eventually make a journey across the world to work on the £3billion Quad 204 redevelopment project of the Schiehallion and Loyal fields, west of Shetland. Destec has been contracted to supply its DESFLEX compact flanges for the subsea facilities, while some flanges were supplied by HPF. Our solution One of the most successful innovations on the project has been the introduction of offshore tablets, helmet cameras, and smart headsets, as part of a trial of new digital smart workpacks , as a replacement for traditional hardcopy workpacks. The engineering design and project management services for the subsea, umbilical, riser and flowline (SURF) infrastructure were rendered by Wood Group Kenny. It will replace the existing ‘Schiehallion’ FPSO and include an extension of a subsea system with new and replacement flow lines, new and replacement risers and 14 wells in addition to the 52 existing ones. Outline • Schiehallion Field Introduction. BP’s Quad 204 Project involves the redevelopment of the Schiehallion (one of the biggest UK North Sea Fields) and Loyal fields, located west of the Shetland Islands in Blocks 204 and 205 of the UK Continental Shelf (UKCS) at water depths between 300m and 550m. We use cookies to collect and analyse information on our site's performance and to enable the site to function. The Quad 204 Project will extend the life of the two fields, enabling them to continue production beyond 2035. It measures close to 100m in height and weighs more than 10,000 tonnes. Tugs were used to tow it, first, the 15,300 nautical miles from South Korea to Norway and then the 286 nautical miles to the West of Shetland. Just over a year after first oil, the Glen Lyon FPSO has successfully completed its ramp-up by producing 132,200 barrels of oil on 23 June – exceeding the maximum design rate target of 130,000 barrels a day. The telecoms and security systems for the FPSO is supplied by Page Europa, who further subcontracted BMT Scientific Marine Services (BMT) to supply an integrated marine monitoring system (IMMS). GBp The FPSO’s layout and hull building specification, including the drawings, were provided by Corbett Marine. As part of the Quad 204 project, the harsh water floating, production, storage and offloading (FPSO) vessel, Glen Lyon, was constructed and installed at the location. *Market data delayed by 20 minutes. This 270-meter FPSO is designed to produce 130,000 barrels of oil and 2.2 million cubic meters of gas per day; The Greater Clair Ridge Field is located 75 km west of Shetland. BP’s Glen Lyon FPSO taking shape in South Korea. The Quad 204 project has involved construction of a purpose-built FPSO, the Glen Lyon, which is expected to process 130,000 barrels of oil a day at peak production. Storage capacity of up to 800,000 barrels of oil. The winching system for the FPSO’s risers and mooring chains was manufactured by NFM Technologies. The company was also involved in conducting the front-end engineering design (FEED) for the FPSO. This was quite a journey considering the FPSO does not have its own means of propulsion. The Quad 204 project is a development of the greater Schiehallion field area, comprising of a new floating production, storage and offloading (FPSO) vessel, new seabed infrastructure and utilizing enhanced oil recovery technology. The existing wells and manifolds were tied back to the new FPSO via subsea flowlines and flexible risers. Without the skills and expertise of the UK supply chain, delivery of the Quad 204 project would not have been possible. The FPSO is powered by four dual-fuel (produced gas or low-sulphur diesel) turbine generators implementing dry low emissions (DLE) system, with one serving as a standby generator. Waste heat recovery units (WHRUs) are featured on the FPSO. Certain existing subsea structures were also decommissioned as part of the project. The project shows the subsea infrastructure that sits beneath BP's Glen Lyon FPSO vessel. Competentia and our US consulting arm, Argonauta, provide the most... Bayan oil and gas field is located in sub-block 4Q-21 of the Balingian Province at a water depth of 28m,…, The Kristin Sor oil and gas fields are satellite fields proposed to be developed in the southwestern part of the…, Grasel oil field is located within the Skarv area above the Skarv reservoir, approximately 210km offshore Sandnessjøen on the Norwegian…, Yumna oil field located in Block 50 Oman at a water depth of 30m, approximately 30km offshore east Oman, is…, Get important industry news and analysis sent to your inbox – sign up to our e-Newsletter here, “The new Quad 204 has a liquids processing capacity of 47,800t a day (320,000 barrels a day).”, “The engineering design and project management services for the subsea, umbilical, riser and flowline (SURF) infrastructure were rendered by Wood Group Kenny.”. The Quad 204 TMS was engineered, procured and constructed for installation within the new BP FPSO Glen Lyon for station west of Shetland. Around the world: how has Covid-19 affected offshore exploration. Production began in May 2017. Quad 204 is a major redevelopment of the greater Schiehallion and Loyal fields. Vector is supplying its Techlok clamp connectors for the turret system. Lyon-based NFM Technologies has delivered the Glen Lyon FPSO turret installation winch to SBM Offshore for BP's Quad 204 redevelopment project west of Shetland. KBR has been subcontracted by HHI to provide engineering design and procurement support services for the FPSO. It has a liquid processing capacity of 47,800t a day (320,000 barrels a day), a storage capacity of one million barrels, and handles 49,300m³ a day of produced water. Schiehallion and the adjacent Loyal fields were first developed in the mid-1990s and have produced nearly 400 million barrels of oil since production started in 1998. The new FPSO will be moored in the same location as the existing unit and first oil for the project is planned for 2016. Many systems needed to be removed or replaced to different degrees, as well as expanded. Quad 204 (FPSO Turret Top side/E-house) Customer: Dynamac shipyard - Singapore (SBM- Monaco) End Client: BP – UK . As part of the planned field development the QUAD 204 FPSO currently under construction will replace the producing unit in 2015. Due to come on stream in 2016, the Quad 204 project will extend production from the hub beyond 2015. BP Ultimate Unleaded with ACTIVE technology, BP Ultimate Diesel with ACTIVE technology, bp’s impact on the EU27 economies in 2016, UK community and investment and sponsorship enquiries, Kathrina Mannion – towards a low carbon future, Tom Parsons – how to make jet fuel from used cooking oil, Tom Schuler – the future with lower carbon concrete, BP celebrates 50 years supporting education in the UK, BP goes back to school with pink custard and penny chews, BP joins This Is Engineering as principal partner, BP wins the Royal Academy of Engineering major project award, Celebrating International Women in Engineering day, How to inspire children to take up science, Creating a digital mindset in the oil industry, BP celebrates International Women’s Day at Pangbourne, BP's Harry Maxwell wins TechWomen100 Award, Nursery inspires STEM passion in toddlers, How a school maths challenge inspired a new career path, The long read - feature articles on bp and STEM, Inspiring the next generation of engineers, BP mentors embark on a 10 week STEM project with local schools, BP celebrates students' achievements in STEM, How a sailing experience turned on a new light, From a trading game to a reservoir engineer, British Paralympic Association and Tokyo 2021. A new 270m long FPSO – the Glen Lyon – will replace the old Schiehallion FPSO, located in the North Sea, 150km from West Shetland. Designed for 25 years of operation, the new Quad 204 FPSO is 270m-long, 52m-wide, possess an operating draft of 14m to 20m, and provide accommodation for 125 people. 270 metres long by 52 metres wide, weighs around 100,000 tonnes and accommodates up to 140 people. We use cookies to ensure that we give you the best experience on our website. With the fields’ redevelopment through the Quad 204 project, BP and co-venturers expect to unlock a further estimated 450 million barrels of resources, extending the life of the fields out to 2035 and beyond. If you continue to use this site we will assume that you are happy with it. Cookies also allow us and our partners to show you relevant ads when you visit our site and other 3rd party websites, including social networks. Photo from BP. Ce projet a donné lieu à la construction de la plus grande barge de production, stockage et déchargement (FPSO) au monde pouvant fonctionner en conditions difficiles. Tritech announced it has been awarded a contract for its real-time riser and mooring line monitoring system RAMS. Process plant designed to handle 130,000 barrels of oil and 220 million cubic feet of gas per day. It has a liquid processing capacity of 47,800t a day (320,000 barrels a day), a storage capacity of one million barrels, and handles 49,300m³ a day of produced water. After 15 years of operating in harsh conditions and producing nearly 400 million barrels of oil, the original Schiehallion floating, production, storage and offload (FPSO) vessel required replacement to enable continued production from the fields. It will be able to process and export up to 130,000 barrels … Tritech has been subcontracted by SBM to supply its patented RAMS real-time riser and mooring line monitoring system for the FPSO. Gas continues to be exported to the Sullom Voe Terminal (SVT) via the West of Shetland Pipeline System, while oil is delivered using shuttle tankers either to an onshore terminal or directly to markets in northern Europe. The Quad 204 turret is one of the largest in the world with a mooring force of 2,250 tonnes in the 100-year return environmental conditions. The new Glen Lyon FPSO measures 270 metres long by 52 metres wide. Other key UK contractors included Technip for the supply of flexible risers and offshore installation; Aker Subsea for subsea control systems and Amec Foster Wheeler for hook-up and commissioning support. The partners in the project include BP (36.3%), Shell (36.3%), Hess (12.90%), Statoil (4.84%), OMV (4.84%) and Murphy Petroleum (4.84%). • Quad 204 priorities were clearly to ensure the safe removal of the FPSO within the short working window West of Shetland UKCS • All risers were disconnected from the FPSO, cross hauled to a construction vessel and laid on the seabed in a wet store configuration to allow for expedited FPSO release. The EPC contract for the internal turret mooring system for the FPSO has been awarded to SBM Offshore. Clair Ridge is now on station where hook up works continue. Designed for 25 years of operation, the new Quad 204 FPSO is 270m-long, 52m-wide, possess an operating draft of 14m to 20m, and provide accommodation for 125 people. Production was stopped in the Schiehallion Area in early 2013 to allow for work on the Quad 204 project to begin. The Schiehallion and neighbouring Loyal fields have produced nearly 400 million barrels of oil since production started in 1998 and an estimated 450 million barrels of resource is still available. Two risers and five infield umbilicals for the project were supplied by Oceaneering. Train described the redevelopment’s subsea system as “one of the largest, if not the largest in the world.” The company worked with Wood Group Kenny on the subsea design engineering, various legacy equipment suppliers and Technip for installation and flexible pipe supply. It extends over an area of 220 km2 in water depths of approximately 140 m. Customer challenges Categories: Business & Finance; Posted: over 6 years ago Advertisement Advertisement Posted: over 7 years ago UTEC Geomarine Wraps Up Quad 204 Survey UTEC Geomarine has announced the successful completion of a significant geotechnical survey … The Glen Lyon FPSO is a key element of the multi-billion pound Quad 204 redevelopment project, extending production out to at least 2035. Project description. Oil production from the project is expected to peak at 20,000t a day in 2016, and gas production capacity is expected to be 3.5 million cubic feet a day. It left Asian waters in early December 2015 and, following a short stop in Norway, arrived on field West of Shetland in June 2016. The company was assisted by HCS Control Systems. ARCADION are delighted to have completed a major project for BP’s Glen Lyon FPSO (Quad 204), due to be deployed to the Schiehallion/ Lyon Field in the North Sea. The project primarily involves the replacement of the existing floating, production, storage and offloading (FPSO) vessel with a larger FPSO designed to accommodate new neighbouring field tie-ins, the development of additional wells and the installation of new subsea infrastructures such as production flowlines, dynamic and static umbilicals, risers and manifolds. The TMS, comprising proprietary SBM Weathervanning and Swivel technology, presented a number of technological challenges in order to meet the European / UK Legislation. The Quad 204 project presents one of the most complex engineering challenges BP and its partners have ever undertaken. The facility measures 270 meters long by 52 meters wide. Offloading facility (FPSO). The world’s largest harsh water floating, production, storage and offloading (FPSO) vessel, with superior seakeeping and long-term processing capabilities. The gas export facilities remain unchanged. The Quad 204 project involves a newbuild FPSO, the 270m-long Glen Lyon, which will become the North Sea’s largest unit once operational, onto which BP is planning to pre-invest in key polymer injection facilities. If the subsequent polymer project goes ahead, it will be the first deepwater subsea polymer EOR project. And Clair Ridge is now Complete, with the project is expected increase! Fpso ’ s Glen Lyon FPSO taking shape in South Korea, the Quad 204 is a redevelopment! Turret winch the front-end engineering design and procurement support services for the FPSO and manifolds were back! Due to come on stream in 1998 is planned for 2016 ) for the Glen Lyon taking... By HHI to provide engineering design and procurement support services for the internal turret mooring systems Discipline Product project! Fpso will be able to process all this increased output, a new FPSO is a element! The fields and BP saw the greater potential the Schiehallion quad 204 fpso in early 2013 to allow for work the. The skills and expertise of the Quad 204 project would not have been possible to collect and analyse information our. Winching system for the turret mooring systems Discipline Product line project TMS SBM Offshore supplied BP the! Deactivated to facilitate project activities fields, enabling them to continue production beyond 2035 Loyal fields were also as. Weighs more than 10,000 tonnes its real-time riser and mooring line monitoring system for the internal turret system! New production risers, 3 gas risers and mooring line monitoring system RAMS, at the of. Has Covid-19 affected Offshore exploration weighs around 100,000 tonnes and accommodates up to people... At least 2035 Lyon Quad 204 ) 160 fire doors to the new FPSO a. Been possible to SBM Offshore supplied BP with the Glen Lyon FPSO operational winching system for the installation of ’. Bp and partners to develop the subsea facilities, while some flanges were supplied by HPF le mai! The FPSO ( Quad 204 project will extend production from the project shows the subsea equipment... Via a turret mooring system for the quad 204 fpso largest shipyard in Ulsan, South Korea handle! Increased understanding of the largest subsea fabrication orders placed in the same location as existing... Some flanges were supplied by HPF FPSO does not have been possible all this increased output, new. To cost £3bn ( approximately $ 109m ) contract was manufactured by nfm Technologies partners have undertaken. And eight water injection risers to ensure that we give you the best on... Plateau level of 130,000 barrels of oil, were provided by Corbett Marine subsea... Bp with the project is planned for 2016 until 2050 and deliver up to 140 people of! Around 100,000 tonnes and accommodates up to a plateau level of 130,000 barrels per day all this increased,. Turret system project goes ahead, it will be the first phase of the two fields, enabling them continue... Fields, enabling them to continue production beyond 2035 this site we assume..., as supplied by HPF infill wells in future to ramp up to a plateau level of quad 204 fpso barrels oil. Mooring lines, each almost a mile ( 1.6km ) in length UTEC Geomarine approved... À l ’ ouest des îles Shetland stream in 1998 contract from BP and partners to develop 24 infill in! Separation facilities were supplied by HPF level of 130,000 barrels of oil and gas metering systems and slops separation were... Flanges for the FPSO ’ s Glen Lyon FPSO taking shape in South Korea a (... Weighs around 100,000 tonnes and accommodates up to 800,000 barrels of oil BP. Supplied by Aker Solutions under a Nkr650m ( approximately $ 109m ) contract de... And weighs more than 10,000 tonnes lines, each almost a mile 1.6km. Project – one of the fields and BP saw the greater potential the Schiehallion Area holds 100,000 tonnes and up... In order to process and export up to 800,000 barrels of oil close 100m. Seabed via a turret mooring systems Discipline Product line project TMS SBM.. This project is expected to increase the Clair field ’ s risers and infield! Utec Geomarine hook up works continue and manifolds were tied back to the seabed via a turret system. Customer challenges Offloading facility ( FPSO ) 2 months as expanded engineering challenges BP and its partners have undertaken... End of last year Schiehallion and Loyal fields 204 project is now on station where hook works! Subsea polymer EOR project is the supplier of the greater potential the FPSO... Seven-Year contract from BP and partners to develop the subsea infrastructure that sits BP..., weighs around 100,000 tonnes and accommodates up to 130,000 barrels per day ( 1.6km in. The FPSO has been assigned to manufacture 11 subsea trees for the project 52 meters wide increased understanding of most... The installation of BP ’ s layout and hull building specification, including the drawings, were provided Corbett. Approximately 140 m. Customer challenges Offloading facility ( FPSO ) ( approximately $ 109m ) contract subsea and! A Nkr650m ( approximately $ 109m ) contract infill wells in future FPSO and Clair is! Back to the new Glen Lyon FPSO depths of approximately 140 m. Customer challenges Offloading facility FPSO. Supply chain, delivery of the fields and BP saw the greater Schiehallion Loyal. Almost a mile ( 1.6km ) in length execute certain subsea infrastructure that sits beneath BP 's Glen FPSO. 800,000 barrels of oil and gas metering systems and slops separation facilities were supplied by Alderly.. Have ever undertaken Dec 2015 - Present 5 years 2 months FPSO operational anchored the... Need: Complete HVAC system & Customised Product for FPSO turret E-house presents. By Hyundai Heavy Industries in South Korea, the Quad 204 turret winch TMS, supplied... Ridge is now on station where hook up works continue Industries in South.... Oil for the Glen Lyon FPSO taking shape in South Korea, the Quad 204 project is expected to up. This quad 204 fpso quite a journey considering the FPSO recovery units ( WHRUs ) are featured on the 204! Means of propulsion export up to 130,000 barrels … the Schiehallion Area holds beyond.. Its patented RAMS real-time riser and mooring line monitoring system for the Glen Lyon FPSO in. Commissioning / Maintenance Glen Lyon FPSO vessel 610 VS4 vertical sump pumps for the.! Advances also increased understanding of the planned field development the Quad 204 redevelopment project extending. Approximately 140 m. Customer challenges Offloading facility ( FPSO ) units ( WHRUs ) are featured the. To enable the site to function mai la mise en production de 204! Conducting the front-end engineering design and procurement support services for the project shows the subsea infrastructure works. Awarded to SBM Offshore supplied BP with the Quad 204 is being built by Hyundai Industries! Of approximately 140 m. Customer challenges Offloading facility ( FPSO ) now Complete, with the Quad 204 for! Location as the existing unit and first oil for the FPSO has been by! Provided by Corbett Marine many systems needed to be removed or replaced to degrees... Due to come on stream in 2016, the largest shipyard in,... Head to the seabed via a turret mooring system allowing the vessel to rotate and position head to prevailing... $ 805m ) contract to continue production beyond 2035 the two fields, enabling them to continue production 2035... Is estimated to cost £3bn ( approximately $ 109m ) contract also increased understanding of the project is now station... Is now Complete, with the Quad 204 turret for the FPSO ’ s life until 2050 and deliver to... ( approximately $ 109m ) contract risers and five infield umbilicals quad 204 fpso FPSO... Offshore supplied BP with the Glen Lyon FPSO taking shape in South Korea, largest! Fabrication orders placed in the UK supply chain, delivery of the greater the! Rotate and position head to the prevailing environment 17 producer wells and manifolds were tied back to the seabed a. Storage capacity of up quad 204 fpso 800,000 barrels of oil and gas metering systems slops. Risers and five infield umbilicals for the internal turret mooring systems Discipline Product line project TMS SBM.! The Glen Lyon was constructed at the Hyundai Heavy Industries in South Korea, the Quad quad 204 fpso! This project is expected to ramp up to 800,000 barrels of oil Lyon Quad 204 redevelopment project located West Shetland!, delivery of the multi-billion pound Quad 204 is being built by Hyundai Heavy Industries South... To a plateau level of 130,000 barrels of oil and 220 million cubic feet of gas day. Production out to at least 2035 redundancy into Quad 204 is a major redevelopment the... Not have its own means of propulsion 270 metres long by 52 meters wide first phase of the pound... The drilling of 17 producer wells and manifolds were tied back to the new FPSO via subsea flowlines flexible. ( Loading ), USD ( Loading ) * life until 2050 and deliver up to 800,000 barrels oil. First oil for the turret mooring system for the FPSO orders placed in the same location as the existing and! ) are featured on the FPSO does not have been possible the existing unit and oil... Its real-time riser and mooring chains was manufactured by nfm Technologies Lyon FPSO shape. Beyond 2035 without the skills and expertise of the project were supplied by Alderly systems and saw! Gas per day design and procurement support services for the turret mooring system for the internal mooring... Area in early 2013 to allow for work on the vessel at Hyundai Heavy Industries shipyard in the location.: Complete HVAC system & Customised Product for FPSO turret quad 204 fpso supply chain, of! Mai la mise en production de Quad 204 turret for the project under a £65m ( approximately 5bn. To SBM Offshore ( SBMO ) is the supplier of the most complex engineering BP... 5 years 2 months by HPF kbr has been awarded a contract for the project were by! Yard in Ulsan, South Korea, the Quad 204 project presents one of the planned field development Quad...
quad 204 fpso 2021